It's been several days without rain here, and there has been no construction yet. Sort of a waste of good weather, though the temps have been in the high 90s. Guess the crews could've been working early in the A.M.
We don't have permit yet, only because we don't have everyone contracted. Argh. You'd think the City could let us have a "foundation only" permit. Called the floor joist suppliers and they won't be able to deliver anything (realistically) for 4-5 weeks. Have to get them on board too. Kitchen cabinets has been quite a trip as well.
Lastly, our interior consultant has just notified us that she's moving to Atlanta in two weeks (less than that at the time of this post). We've barely begun working with her, which is a good thing, I suppose. However, I was really looking forward to having her help.
Maybe it would've been easier hiring a GC?
Posted by julietiu
at 17:45 CDT